Skip to content

Additional services

Everything aroundthe system.

Surface treatment, testing and documentation — the work that determines whether a system passes qualification.

  • 01

    Pickling and passivation

    Chemical treatment of welded stainless steel to restore the passive chromium oxide layer and remove heat tint and free iron.

  • 02

    Roughness testing

    Surface roughness measurement against the specified Ra value, on site, with documented readings per location.

  • 03

    Spray ball coverage testing

    Riboflavin coverage testing of tanks and vessels to prove that CIP spray devices wet every internal surface.

  • 04

    Bore scoping

    Internal video inspection of welds and pipe bores where the joint cannot be inspected any other way.

  • 05

    Orbital welding

    Automated GTAW welding with a recorded parameter set for every joint and a weld log that stands up in an audit.

  • 06

    Validation documentation

    FAT, SAT, DQ, IQ, OQ and PQ protocols and reports, prepared to the client's quality system.